2018 | EC Company | Ridgewood Elementary School | Install an 818 power vault and vents along with the underground primary and secondary power trenching and duct bank installation. |
2018 | Cochran Electric | Hyatt United Way Hotel | Install (1) 42'x13' panel vault along with the associated vent piping. |
2018 | Merit Electric | Grand Belmont Mixed Use | Install a 1024 and 5106 electrical vault along with the trenching and duct bank installation for the associated primary and secondary power feeds. |
2018 | EC Company | Harriet Tubman Middle School | Install a 5106 electrical vault and bollards along with the trenching and duct bank installation for the associated primary and secondary power feeds. |
2018 | Berg Electric | Riverplace Parcel 3 | Install a 712 and 816 electrical vaults along with the associated trenching and duct bank installation for the primary and secondary power feeds. |
2018 | Portland General Electric | Marquam Radial - Water Avenue | Perform the trenching and duct bank installation along with the associated tie-ins out of the Marquam Substation. |
2018 | Merit Electric | Woody Guthrie Apartments | Install an 818 power vault and vents along with the underground primary and secondary power trenching and duct bank installation. |
2018 | Berg Electric | 250 Taylor Contract | Install a 5106 electrical vault along with the trenching and duct bank installation for the associated primary and secondary power feeds. |
2018 | Kerr Contractors | Reeds Crossing Vault Set | Excavate, install the shoring and set a 1022 electrical vault. |
2018 | SK Hoff Construction | 50th & Division | Install a 1024 and 5106 electrical vaults along with the primary and secondary power feeds. In addition, perform the trenching and conduit installation for the communication underground feeds. |
2018 | Hughes Electrical | 217 X Street Bore, Vancouver | Install an underground power feed by means of directional drilling. |
2018 | Cochran Electric | Oregon Convention Center Parking Garage | Install (1) 24'x13' panel vault along with the associated power feeds from it. |
2018 | Merit Electric | SW 3rd & Ash | Install a 1024 vault along with the trenching and duct bank installation associated with the primary and secondary power feeds. |
2017 | Stoner Electric | Towne Storage VLT & Conduit work - NW 2nd & Ankeny | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Portland General Electric | McGill Substation - Phase 3 | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2017 | LMV Glisan Holdings | Glisan Apartments | Install (1) 1024 and (2) 5106 electrical vaults along with open trenching to install the primary and secondary electrical feeds. In addition in both common and stand alone trenches install the ducts for the communication underground infrastructure |
2017 | Data Center West Coast LLC | Data Center Bores | Install the primary and secondary electrical feeds by means of trenching and directional drilling |
2017 | Merit Electric | Modera Buckman | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Portland General Electric | Marquam Feeder Segment 2 | Install an electrical vaults along with the trenching and duct bank for the associated primary power feed from the Marquam Substation. |
2017 | Essex General Construction | Overton 15 Project | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Merit Electric | 23rd & Hawthorne Apartments | Open trench to install electrical conduit for a secondary power feed. |
2017 | OEG | Mult Co Courthouse - Secondary Power | Open trench to install electrical conduit for a secondary power feed. |
2017 | Affordable Electric | 1620 NW 14th & Raleigh | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Portland General Electric | Abernathy Sub Get-a-ways | Install an electrical vaults along with the trenching and horizonal boring for the power duct bank for the associated primary power feed from the Abernathy Substation. |
2017 | Cherry City Electric | Block 20 Condos - PGE Street Relocation | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Portland General Electric | Tektronix Ug Feeder | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2017 | Cherry City Electric | Block 20 @ NW 12th & Overton | |
2017 | Berg Electric Corp | Broadstone Reveal @ 1400 NW Raleigh Street Temp PWR | Open trench to install electrical conduit for a secondary power feed. |
2017 | Berg Electric Corp | Broadstone Reveal @ 1400 NW Raleigh Street 1024 Set | Excavate, install the shoring and install (1) 1024 electrical vault |
2017 | Stoner Electric | Pearl Canopy Vault & Conduit work @ SW 9th & Glisan | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Berg Electric Corp | Conway Blocks 294 & 295 | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Oneill Construction Group | 120 Clay | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2017 | Portland General Electric | Naito Parkway Utility Potholing | Pothole by means of vacuum excavation the existing utilities to determine depth and size for a future electrical feed. |
2017 | Portland General Electric | Marquam Network Feeder Segment 1 | Install an electrical vaults along with the trenching and duct bank for the associated primary power feed from the Marquam Substation. |
2017 | Cochran Electric | 12th & Market Apartments | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2016 | Cochran | 419 East Burnside | Install an electrical vault along with the trenching and duct bank for the associated power feeds. |
2016 | Power Technology Inc | Pacificorps Parkrose Substation | Tie into an existing electrical substation and extend some underground feeds from it with underground duct banks performed by open cut excavation and directional drilling. |
2016 | Berg Electric | South Cooper MTN High School Trenching | Provide the trenching and backfilling to install electrical and communication duct banks for a new campus project. |
2016 | Oregon Electrical Corp | Block 29 @ SW Curry & Moody | Install an electrical vault along with the trenching and duct bank for the associated power feeds. |
2016 | Hughes Electrical | Under Armour Building | Tie into an existing electrical vault and extend the power feed across the new campus into the basement area of an existing building that was over 30 feet deep by means of directional drilling. |
2016 | ILB / West Oregon Electric | HWY 26 Landslide Bypass - Vernonia, OR | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2016 | Portland General Electric | NW Brookwood Parkway | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2016 | Portland General Electric | Nike Campus Expansion - Power Upgrade | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2016 | VWR Development | Overlook Apartments | Install an electrical vault along with the trenching and duct bank for the associated power feeds. |
2016 | Berg Electric | Conway Blocks - Section 4 for block 295-294 | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2016 | Portland General Electric | NW 23rd Road - Conduit & Vault Installation | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2016 | Portland General Electric | SW Terman Road | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2016 | ILB/Pacificorp | Redwood Avenue Cable Replacement | Underground power conductor replacement by means of directional drilling along with vault sets and tie-ins. |
2016 | Electrical Construction | PSU School of Business BP#3 | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2016 | Cherry City Electric | 17th & Front | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2015 | Berg Electric Corp | Q21 -2140 NW 21st St. | Install an electrical vault along with the trenching and duct bank for the associated power feeds. |
2015 | Quality Plus Services | Goose Hollow PGE VLTS - SW 15th & Taylor | Install an electrical vault along with the trenching and duct bank for the associated primary and secondary power feeds. |
2015 | Portland General Electric | SE 257th Avenue, Troutdale | Underground power conductor replacement by means of directional drilling along with vault sets and tie-ins. |
2015 | Portland General Electric | NE 19th St, Gresham | Underground power conductor replacement by means of directional drilling along with vault sets and tie-ins. |
2015 | Pacific Corp | Albany Substation Rock Installation | Import, place and grade out crushed rock within an existing electrical substation. |
2015 | McMinnville Water & Light | Meadowbrook Apartments HDD | Install vaults and install the underground primary power feeds by means of directional drilling along with the associated tie-ins. |
2015 | Hughes Electrical | Via West Bollards | Install barrier posts around existing transformers and switch vault locations. |
2015 | Clark Co Pud | NE 47th Avenue | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2015 | Bremik Construction | Market St. Apartments - SW 11th Market | Install an electrical vaults along with the trenching and duct bank for the associated primary and secondary power feeds. |
2015 | Berg Electric Corp | New Hyatt Hotel | Install an electrical vault along with the trenching and duct bank for the associated power feeds. |